



Facilities
Our Facilities

BOSS Constructions' operational space of around 55000sqm provides us with ample room to carry out fabrication processes such as cutting, welding, and assembly. Our advanced machinery and equipment enable us to produce high-quality structural steel with precision and accuracy.
In addition to our workshop, our storage site on Barrier Highway in Broken Hill further enhances our capabilities spanning approximately 1000m in length, this site allows us to store and organize large steel components and materials efficiently.
​
Here's a brief overview of our head office and workshop facility:
-
3 x 10ton overhead cranes
-
CNC beam line drilling machine
-
120t punch and shear machine
-
400t x 6m CNC break press
-
12mm x 3 metres & 4m x 3 mm guillotines
-
Bandsaw, radial arm drill & profile cutting, milling machine and lathes
-
Enclosed blast room (blaster mobile for site work)
-
Powder coating oven
-
Powder coating booth – 2.4m x 6m
-
Welders: MIG, TIG, Stick and petrol

3D Model of the proposed layout for
564-638 Barrier Highway, Broken Hill, NSW 2880